Case studies
View next case study
kEmergency Back-up Synchronising
Ceylinco Reality Plaza is a large shopping complex with 200 up-market shops, a 300 seat cinema and large food park. Located in the city of Ja-ela, Grampaha District, Sri Lanka, the new shopping comples required an emergency back-up power supply in the event of a mains failure.
The project was completed in March 2007 giving the company 3x 500KVA synchronising generators with Volvo 1641 electronic engines. DSE5510 modules were fitted to the panel to provide synchronisng, control and monitoring and DSE530 provided the mains monitoring and chageover control.
"We had to compete against local Cummins agent. Their control system did not have some features such as priority select, hours balancing, exitation loss and remote communication from engineers´ room. Thanks to DSE this also has very user-friendly software. Because of the functions, controls and simplicity in DSE we won the project". - Lalindra Gunatilake, Soar Technologies.